Pajak Engineering Ltd. is proud to be a Canadian company, providing wellsite supervision & project management both domestically and internationally. We are registered with APEGGA as a compliant permit holder. See a few of our recent Canadian oilfield management projects below.
Pajak Engineering Ltd. acted as Project Manager for Galleon Energy Inc. in the surveying, drilling and casing for all the company’s wells since inception in August, 2003. This included all the wells on the Peace River Arch in Northwest Alberta, Canada. Well Depths varied from 500 to 3200 meters. The company grew to the 15,000 BOEPD range and hired additional staff to handle all operations.
Pajak Engineering Ltd. is acting as Project Manager for the construction, drilling and completion of wells located throughout Alberta and Saskatchewan, Canada. The well depths vary from 700-1400 meters.
Pajak Engineering Ltd. acted as Project Manager for two (2) 1800 meter horizontal oil wells in the Maidstone Saskatchewan, Canada area. Further drilling is anticipated.
Pajak Engineering Ltd. acted as Project Manager for the drilling and completion of a 2265 meter horizontal, underbalanced gas well in the remote Kotcho area of NE British Columbia, Canada. Pajak looked after logistics, drilling and completion of this one well project.
Pajak Engineering Ltd. acted as Project Manager for a deep wildcat well located in Northwest Alberta, Canada. The well is located in a sensitive caribou area and was drilled during a short winter window.